Genclik Parki, Ankara

Gençlik Parki Ankara - Opening 29.10.2011

Tezer Insaat from artibirgrup.com - our partner in Istanbul, Turkey

permament installation: dancing water system incl. laser, video, light and sound

http://www.youtube.com/watch?v=Cq3hlU-oU9E

Programming: Jan Eiserloh
Design + CAD: Daniel Brune
Managing and Organization: Aycan Orhan

Organization: TEZER Insaat & Ticaret A.S.

Technical planning: Tobias Panske


A big thanks and highest respect to the whole laserfabrik crew, for uncountable working hours and the support to realize all our ideas.

Keyfacts

  • 206 pumps
  • 1588 nozzles
  • 338 LED lamps
  • 42m water screen
  • 98km cabling
  • up to 25W laser power, 3 laser projection units
  • 2x 22k ANSI lumen video projection
  • 820.000W total power, including 60.000W light power
  • 1800A per phase power consumption
  • all in combined allows us to move 8.000.000l of water per hour
  • up to 7 tons of water in less than 2 seconds
  • total weight of installed equipment: 38 tons, including more than 90% stainless steel, copper and brass
  • 30 technicians and 2 years of planning and installation